Project Category: Waterworks

  • Hurricane Melissa Relief

    Hurricane Melissa Relief

    Project Description

    Following Hurricane Melissa, several communities across Jamaica were left without reliable access to clean and safe drinking water. Many of these areas are remote and difficult to reach, making restoration through traditional infrastructure both slow and resource-intensive. With affected populations placed on priority lists that could delay relief, there was an urgent need for a solution that could deliver immediate impact while supporting long-term resilience.

  • Appleton Ponds

    Appleton Ponds

  • West Indies Petrolium Pipeline

    West Indies Petrolium Pipeline

    Project Description

    The West Indies Petroleum (WIP) has leased two large tanks to function as fuel bunkering for cruise ships at the Reynold’s Pier and Ocho Rios Cruise Terminal. The distance from the tank to the fueling point at the Reynold’s Pier is 200 meters and 500 meters to the fueling point at the Ocho Rios Cruise Terminal. As this is an active cruise destination, the footprint had to be minimal and the work zone could not affect the cruise traffic.

  • Dairy Industries – Kingston

    Dairy Industries – Kingston

    Project Description

    Dairy Industries, one of the largest producers of milk-based products in Jamaica, had a problem with phosphate levels in the effluent being discharged from its wastewater treatment plant. The phosphate levels, 30ppm, were above the standards set, 4ppm, by the local environmental regulatory authority. There was also a space constraint for the additional wastewater treatment facility.

  • St. Lucia filtration WASCO

    St. Lucia filtration WASCO

  • Island Grill

    Island Grill

  • Grace Wastewater, Savanna-la-Mar

    Grace Wastewater, Savanna-la-Mar

    Project Description

    GK Foods, one of the largest manufacturers and processors of food items in Jamaica, has an issue at its processing plant in Savanna-la-Mar, Westmoreland in Jamaica. The BOD, COD, TSS and Phosphates all exceed the local environmental regulatory authority standards.

  • Antigua Greenhouse

    Antigua Greenhouse

  • Chukka Caribbean Adventures Limited

    Chukka Caribbean Adventures Limited

    Project Description

    The Chukka Cove Adventures attraction located in Good Hope Trelawny is one of the major tourist attractions along the north coast corridor of Jamaica. Located in such a very fragile aquatic ecosystem wastewater management became a very important component and concerns for the client contacted Isratech Jamaica Limited to assist with finding an effective economical and environmentally friendly solution. The Treatment system that was in place was not adequate enough to provide proper treatment of the wastewater that was being generated daily at the facility and hence raised concerns about pollution of the river that runs through the property. The river forms a major part of the attractions activities. The regulatory authorities was also putting pressure on the entity to provide a solution that would eliminate ground as well as surface water pollution.

  • Yummy Bakery

    Yummy Bakery

    Project Description

    Over the years Yummy Bakery was having serious challenges with managing their wastewater in terms of Finance and Environmental issues. Bakery wastewater is high strength wastewater in terms of organic loads (BOD- >2,500mg/l/COD- >4500mg/l/ FOG- >500mg/l) Financially there was a recurrent cost for frequent Cess Pool Services to empty clogged soak-away pits which was putting a strain on cash flow. Also new soak-away pits had to be dug relatively frequently while abandoning the old ones which can no longer soak. Untreated wastewater overflows from the old pits onto adjoining properties which then became also a legal issue Environmentally raw wastewater was being discharged to the surrounding areas and as a result the relevant authorities demanded that the situation be addressed with a solution that will minimize negative environmental impacts