SOS is located at 23 – 25 Beechwood Avenue, Kingston 5 and boasts a 3,000 sq. ft. showroom filled with samples of the various furniture and stationery items available in stock.

Problem/ Challenge:

High energy bills which drove up the company’s operating expenditures budget.

Solution

Isratech installed a SMA inverter- based grid tie Solar PV system connected in balanced three-phase 220Vac format. The solar panels were installed on the rooftops of the two buildings on the premises.

System Description

Size: 75.KWp
Panels: 292 x 255W Renesola Solar Panels
Inverter: 9, 7KW SMA Grid Tie Inverters
Estimated Annual Production: 104.5MWH

Benefits, Results Achieved:

SOS saves over 104.5MWH per year avoided costs from the grid. The entity is very proud of the project and values its contribution to the preservation of the environment. The company stands to benefit from the increased business opportunities which will be available due to this display of having a policy of environmental sustainability.